This project involves dredging and re-excavation of the Bengali-Korotoa-Fuljor-Hurasagor River system, aimed at restoring the river’s navigability and mitigating flood risks. The project also includes bank protection works to prevent erosion and safeguard the surrounding areas. The initiative is crucial for improving water flow and preserving the river’s ecological and economic importance.